10 Things to Consider Before Starting a Remodel in Hawley, PA
Back to Blog
General Contracting· 6 min read·January 8, 2024

10 Things to Consider Before Starting a Remodel in Hawley, PA

Remodeling in Hawley, PA? These 10 considerations will save you money, time, and frustration before the first wall comes down.

Key Takeaways

  • Permit requirements in Wayne County vary by project type and municipality
  • Pre-1980 homes require hazardous material testing before renovation begins
  • Budget 15–20% contingency above your estimate for renovation projects
  • All American Rubbish manages renovation projects in Hawley from permits through completion
  • Call (888) 883-6161 for a free estimate

1. Pull the Required Permits

Renovation work in Hawley that involves structural changes, electrical, plumbing, or HVAC requires permits from Wayne County or your local township. Unpermitted work creates problems at resale and may need to be torn out.

2. Test for Asbestos and Lead Paint

If your Hawley property was built before 1980, testing for asbestos and lead paint is required before demo begins. This is not optional.

3. Identify Load-Bearing Walls

Before removing any walls, verify which are load-bearing. This requires a structural assessment and, in many cases, engineering sign-off and a temporary support structure.

4. Budget a 15–20% Contingency

Renovations in older Hawley properties regularly uncover surprises — old wiring, plumbing that doesn't meet code, hidden moisture damage. Budget a contingency before you start.

5. Plan Your Temporary Living Arrangement

For major kitchen, bathroom, or full interior renovations, plan where you'll live during the work. A realistic timeline and a plan for temporary facilities prevents the project from creating a livability crisis.

6. Sequence the Work Correctly

Demolition before construction. Framing before mechanicals. Mechanicals before drywall. Drywall before finish work. Out-of-sequence work creates expensive rework.

7. Choose Materials Before Demo Begins

Supply chain delays are real. Order long-lead materials — windows, specialty tile, custom cabinetry — before demolition starts to avoid weeks of waiting mid-project.

8. Get Everything in Writing

Scope, materials, timeline, payment schedule, and change order process should all be documented before work begins.

9. Understand the Payment Schedule

Avoid contractors who require large upfront deposits. Standard practice is a deposit at signing, progress payments at defined milestones, and a holdback until completion.

10. Choose a Contractor With Local Experience

Wayne County has specific permit requirements, weather patterns that affect scheduling, and a network of local subcontractors. A contractor with local experience navigates all of this more efficiently.

Call (888) 883-6161 to discuss your Hawley remodel with our experienced team.